OASIS Mailing List ArchivesView the OASIS mailing list archive below
or browse/search using MarkMail.

 


Help: OASIS Mailing Lists Help | MarkMail Help

office message

[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]


Subject: [OASIS Issue Tracker] (OFFICE-3873) PAS Comment JP2: Semantics of the interactions of the change-tracking elements are unclear


     [ https://issues.oasis-open.org/browse/OFFICE-3873?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Svante Schubert updated OFFICE-3873:
------------------------------------
      Proposal: 
Resolution: https://lists.oasis-open.org/archives/office/201809/msg00006.html

"The under-specification of change tracking in ODF 1.2 resulted in a number of different choices being possible as to how to implement the feature. While each of these choices would be consistent with the way that the feature is specified, unless identical choices are made, it is likely that the resulting implementations would not be fully interoperable. For this reason, where interoperability of change tracking between implementations is required, implementers are recommended to carry out specific checks that their implementation choices are the same or similar enough to be interoperable."
    Resolution: 
The under-specification of change tracking in ODF 1.2 resulted
in varying implementations of this feature. Where interoperability
between implementations is required, this feature should be checked for
interoperability.

  was:"The under-specification of change tracking in ODF 1.2 resulted in a number of different choices being possible as to how to implement the feature. While each of these choices would be consistent with the way that the feature is specified, unless identical choices are made, it is likely that the resulting implementations would not be fully interoperable. For this reason, where interoperability of change tracking between implementations is required, implementers are recommended to carry out specific checks that their implementation choices are the same or similar enough to be interoperable."

      Assignee: Svante Schubert

> PAS Comment JP2: Semantics of the interactions of the change-tracking elements are unclear
> ------------------------------------------------------------------------------------------
>
>                 Key: OFFICE-3873
>                 URL: https://issues.oasis-open.org/browse/OFFICE-3873
>             Project: OASIS Open Document Format for Office Applications (OpenDocument) TC
>          Issue Type: Bug
>          Components: Change Tracking, General, Part 1 (Schema)
>    Affects Versions: ODF 1.2
>            Reporter: Chris Rae
>            Assignee: Svante Schubert
>            Priority: Major
>
> Comment logged by national body during the ODF 1.2 PAS process, to be address at Ballot Resolution Meeting. 
> Original text of NB comment: Semantics of the interactions of the change-tracking elements are unclear
> Proposed solution: Introduce a new sublause "5.5.0 General":
> 5.5.0
> Semantics of the interactions of the elements defined in 5.5 are
> implementation-dependent.



--
This message was sent by Atlassian Jira
(v8.3.3#803004)


[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]