Document:
06-08-10-Minutes-IF-Subcommittee-DRAFT

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Jeff Waters on 2010-06-22 5:54 pm UTC

Publication Type

None at this time.

Group / Folder

EM Infrastructure Framework SC / Resources

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

414

Download Agreement

None at this time.

Description

Minutes from the IF SC meeting of June 8, 2010. At this meeting, the members discussed the upcoming face-2-face meeting and also the purpose of the DE. : (1) Face-2-face meeting June 28-30 in McClean, Don will send out agenda; (2) use cases will be presented first, anyone welcome to submit, in advance would be better, can follow Don's format; (3) we will then uncover issues, add to issues list, prioritieze and work through them. Goal is to get requirements for DE defined in 2nd quarter. (4) Purpose of DE is one of those issues. General agreement that there is a continuum across two ends of a spectrum, one being the formal grid-based national routing infrastructure (nonrepudiation, policy-oriented routinge) where DE is used within the grid and the other more informal use for general packaging and routing by local systems or in RSS-type polling situations. Each has its challenges, but one concept is that DE is flexible enough to support both.