Does the committee approve the XRI Resolution 2.0 Committee Draft 02 Revision 04 specification (URI below) as a Committee Draft? If yes, does the TC also agree to submit the specification for Public Review?
http://www.oasis-open.org/committees/download.php/27432/xri-resolution-V2.0-cd-02-rv-04.pdf
This ballot requires a Full Majority Vote to Pass. |