Shall the TC approve the following document [1] as an Errata Committee Draft;
And shall the TC confirm that the proposed corrections in this document do not constitute a Substantive Change;
And shall the TC designate the ODF version of the Errata as the authoritative version;
And shall the TC request that OASIS send the document out for a 15-day public review;
And shall the TC request that OASIS notify the stakeholders: ISO/IEC JTC1/SC34, ISO/IEC JTC1/SC34/WG6, OASIS ODF Adoption TC and OASIS ODF Interoperability and Conformance TC?
[1] http://www.oasis-open.org/apps/group_public/download.php/38344/OpenDocument-v1.0-errata-ed04rev03-editor-revison.odt |