Contingent on the approval of the ballot [1] for CSD, do the members of the OASIS Energy Interoperation TC approve the actions in the Description?
Contingent on the approval of CSD Ballot [1] opened 20120509, the OASIS Energy Interoperation TC requests the issuance of OASIS Energy Interoperation Transport Protocol Bindings for OASIS Energy Interoperation 1.0 Version 1.0 Working Draft 04 (Committee Specification Draft 01) and its associated XML artifact(s) packaged together in the Energy Interoperation archive at http://www.oasis-open.org/committees/document.php?document_id=45865&wg_abbrev=energyinterop for a thirty-day Public Review, and direct the Chairs and TC Administrator to perform the necessary actions for that Public Review to start as soon as practicable.
The PDF version of the specification is authoritative.
[1] http://www.oasis-open.org/apps/org/workgroup/energyinterop/ballot.php?id=2226
This is a full majority ballot.
|