Title Approve STIX 2.0 Working Draft 1 as a Committee Specification Draft
Description
The .zip file containing the Multi-part CSD is provided here:

https://www.oasis-open.org/committees/document.php?document_id=59847&wg_abbrev=cti

The Five Parts of the Multi-Part CSD are as follows:

1. stix-v2.0-wd01-part1-stix-core
2. stix-v2.0-wd01-part2-stix-objects
3. stix-v2.0-wd01-part3-cyber-observable-core
4. stix-v2.0-wd01-part4-cyber-observable-objects
5. stix-v2.0-wd01-part5-stix-patterning
Ballot Options Ballot has closed
[ ] Yes
[ ] No
[ ] Abstain
Opening Date Fri, Jan 20 2017 8:00 pm EST
Closing Date Fri, Feb 3 2017 8:00 pm EST
Ballot has closed.

Referenced Items

Name Type Date Actions

03032: Approve STIX 2.0 Working Draft 1 as a Committee Specification Draft

Document (Archive)

2017-02-04