< Home | Return to Ballot listing

Ballot Details    TC Member Ballot View
Close the OASIS OSLC CCM TC

Should the OASIS OSLC CCM TC be closed?

All work products previously proposed for the CCM TC have been transferred to other TCs in the OSLC member section.

The draft Change Management 3.0 specification has been transferred to the OSLC Domains TC, as voted by both the CCM TC and the Domains TC. Open issues for that specification will also be transferred to the Domains TC.

The draft Configuration Management 1.0 specification has been transferred to the OSLC Core TC, as voted by both the CCM TC and the Core TC. Open issues for that specification will also be transferred to the Core TC.

History of the CCM TC will be preserved in a read-only form.

Since the CCM TC now has no work products, the proposal is to close this TC. Vote 'Yes' to close the TC, or 'No' to keep the TC running. If you vote 'No', you must provide reasons, such as a list of outstanding actions.

 [ ]  Yes
 [ ]  No
Opening:   Thursday, 14 September 2017 @ 04:00 pm PDT
Closing:   Monday, 25 September 2017 @ 11:59 pm PDT
Group:   OASIS OSLC Lifecycle Integration for Change and Configuration Management (OSLC CCM) TC
Ballot has closed.

Referenced Items
Name Type Date Action
Document
2017-09-26

Voting Details

Voting Summary

Options with highest number of votes are bold

Option # Votes % of Total
Yes 4 100%
No 0 0%
Eligible members who have voted: 4 of 5 80%
Eligible members who have abstained: 0 of 5 0%
Eligible members who have not voted: 1 of 5 20%

Voting Details

Voter Company VoteReference Document and/or Comment
Brian Steele
IBM
--
 
Nick Crossley
IBM
Yes
 
David Honey
IBM
Yes
 
James Amsden
IBM
Yes
 
Martin Sarabura
PTC
Yes