Document:
02498: Approve SAF V1.0 CS02 as a Candidate OASIS Standard

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Chet Ensign on 2013-09-05 12:10 am UTC

Publication Type

None at this time.

Group / Folder

OASIS Symptoms Automation Framework (SAF) TC / System Ballot Results

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

824

Download Agreement

None at this time.

Description

The Symptoms Automation Framework (SAF) Version 1.0 [1] was approved as a Committee Specification on 30 January 2013. The TC has received three Statements of Use from Fujitsu, BAML and CA [2]. Do you now approve submitting Symptoms Automation Framework (SAF) Version 1.0 CS02 to the OASIS membership for consideration as a Candidate OASIS Standard? Approving this ballot will result in a 60-day public review after which, if no comments are received, the COS will be submitted to a membership-wide ballot. If comments are received, the TC will be asked to vote by Special Majority Ballot on whether to continue to the membership vote. This is explained in TC Process section 3.4.2, Public Review of a Candidate OASIS Standard [3]. This ballot requires a Special Majority Vote [4]. The TC roster currently lists 4 voting members. In order to pass, at least 3 (2/3 x 4) members have to vote Yes and no more than 1 (1/4 x 4) member may vote No. [1] URI to the Committee Specification: http://docs.oasis-open.org/saf/saf/v1.0/cs02/saf-v1.0-cs02.html [2] Links to Statements of Use Fujitsu Laboratories: https://lists.oasis-open.org/archives/saf/201304/msg00000.html Bank of America Merrill Lynch: https://lists.oasis-open.org/archives/saf/201306/msg00001.html CA Technologies: https://lists.oasis-open.org/archives/saf/201306/msg00003.html [3] http://www.oasis-open.org/policies-guidelines/tc-process#OASISstandard [4] Special Majority Vote: http://www.oasis-open.org/committees/process-2010-07-28.php#dSpecialMajority