Document:
EDXL-RM TEP Working Draft 5
Draft (A preliminary unapproved sketch, outline, or version.)
Details
Submitted By Dr. Patti Aymond on 2013-10-08 3:50 pm UTC
Publication Type
None at this time.
Group / Folder
OASIS Emergency Management TC / Specifications
Modified by
Not modified.
Copy
This document is not a copy.
Technical Contact
None at this time.
Download Agreement
None at this time.
Description
An update to the EDXR-RM that addresses issues that arose during the TEP/HL7 mapping. It incudes a substantive change that needs to be reviewed by the TC.