Document:
Charter-clarification-rev2e (Revision 5)

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Jacques Durand on 2013-11-14 5:10 pm UTC

Publication Type

None at this time.

Group / Folder

OASIS Topology and Orchestration Specification for Cloud Applications (TOSCA) TC / Meeting Notes

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

237

Download Agreement

None at this time.

Description

Overall substance of this "clarification":
- avoid the ambiguous "non-vendor specific" expression, which would introduce discrimination between the [possible] standardization of "non-vendor specific" components, and those "vendor specific" components that couldn't be standardized.
- yet allows for standardization of "abstract components" described here as non-product specific.
- editorial corrections suggested by TC admin and advisory board.
- with Effraim suggestion (add "operations" in scope)