Document:
02680: Approve clarifying CAMP TC charter

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Chet Ensign on 2014-10-10 12:10 am UTC

Publication Type

None at this time.

Group / Folder

OASIS Cloud Application Management for Platforms (CAMP) TC / System Ballot Results

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

576

Download Agreement

None at this time.

Description

[1] Charter clarification proposed: In "A list of deliverables", 2nd bullet, 2nd sentence change "The exit criteria must be met before the deliverable advances to Committee Specification." to "The exit criteria must be met before the deliverable advances to OASIS Standard." --- This ballot requires a Special Majority Vote. The TC roster currently lists 8 voting members. In order to pass, at least 6 (2/3 x 8) members have to vote Yes and no more than 2 (1/4 x 8) members may vote No.