Description
LPX Working Draft 04 with updates based on feedback provided in June 18 TC call. The models are summarized in the draft along with an embedded PDF document with documentation generated by the BOUML modeling tool. This will have to be changed to an appropriate reference that conforms with OASIS requirements in the eventual approved committee draft.
This is a redlined version with changes highlighted using Word's track changes feature. A clean version with all changes accepted will be posted separately.