Document:
09June04ActionItems.doc

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Duane Nickull on 2004-06-09 7:20 pm UTC

Publication Type

None at this time.

Group / Folder

OASIS Electronic Business Service Oriented Architecture (ebSOA) TC / Meeting Notes

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

251

Download Agreement

None at this time.

Description

Updated Action Items. Items should be started and ready in draft form for the meeting June 30. This document supercedes the previous 26 May 04 action items (now deleted).

In the interm, any work can also be posted in draft form and we have three volunteers to do review work.