Ballot Details: Approve "Field Force Management Integration Interface Specification V1.0" with changes as a CS (CLOSED)

Ballot Question Do members of the FFM TC approve FFM Integration Interface Specification V1.0 [1] with non-material changes [2] and designated cross reference changes [3] as a Committee Specification?
Ballot Description This ballot requires a Special Majority Vote [4]. The TC roster currently lists 6 voting members. In order to pass, at least 4 members have to vote Yes and no more than 2 members may vote No.

[1] URI for the specification
http://www.oasis-open.org/committees/download.php/46955/latest/FFMII-Specification-20120920-v1 0-wd06.zip

[2] The Working Draft for this Committee Specification contains changes made since its last public review. The changes made are documented in http://www.oasis-open.org/committees/download.php/46998/latest/ffmii-v1.0-wd06-change-list.txt . The TC judges these changes to be Non-Material Changes in accordance with the definition in the OASIS TC Process (http://www.oasis-open.org/policies-guidelines/tc-process#dNonmaterialChange).

[3] This Specification Approval Motion includes the following Designated Cross-Reference Changes requested in accordance with the requirements of Section 2.19 of the TC Process (http://www.oasis-open.org/policies-guidelines/tc-process#crossRefs):

Current reference to be updated:
[FFMII-REQ] Field Force Management Integration Interface Requirements, Version 1.0. 28 February 2012. OASIS Committee Note Draft 02 Public Review Draft 02. https://www.oasis-open.org/committees/download.php/45408/ffm-if-requirements-v1.0-cnprd02.zip

Expected approval status:
Committee Note, October 2012

The TC acknowledges that approval and publication of the specification may be delayed by the Designated Cross-Reference Changes.

[4] http://www.oasis-open.org/committees/process-2010-07-28.php#dSpecialMajority
Ballot Options
VOTING CLOSED: Friday, 5 October 2012 @ 11:59 pm EDT
Yes 6 100
No 0 0
Abstain 0
Open Date Friday, 28 September 2012 @ 12:00 am EDT
Close Date Friday, 5 October 2012 @ 11:59 pm EDT

Voting Statistics

Number of votes cast (excluding abstentions) 6
Eligible members who have voted 6 of 6 100%
Eligible members who have not voted 0 of 6 0%

Voting Summary by Option

Options with highest number of votes are bold
Option # Votes % of Total
Yes 6 100%
No 0 0%
Abstain 0

Voting Details

Voter Name Company Vote * Time (UTC) Comments
* Beniaminy, Israel ClickSoftware Technologies Ltd. Yes 2012-09-29 18:24:00
* Lehtinen, Johannes Rossum Oy Yes 2012-10-01 05:45:00
* Nguyenphu, Thinh Nokia Siemens Networks GmbH & Co. KG Yes 2012-10-03 15:48:00
* Siles, Jose Nokia Siemens Networks GmbH & Co. KG Yes 2012-10-04 05:54:00
* Tiihonen, Juha Aalto University Foundation Yes 2012-09-28 09:47:00
* Vaskuu, Sami Newelo Oy Yes 2012-09-28 06:43:00