Document:
02378: Approve PMRM V1.0 with Non-Material Changes as a Committee Specification?

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Chet Ensign on 2013-03-26 12:08 am UTC

Publication Type

None at this time.

Group / Folder

OASIS Privacy Management Reference Model (PMRM) TC / System Ballot Results

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

640

Download Agreement

None at this time.

Description

This ballot requires a Special Majority Vote [3]. The TC roster currently lists 9 voting members. In order to pass, at least 6 members have to vote Yes and no more than 2 members may vote No. [1] URI for the specification https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48545/PMRM-v1.0-wd06rev1.pdf [2] The Working Draft for this Committee Specification contains changes made since its last public review. The changes made are documented in the red-lined diff file available at https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48546. The TC judges these changes to be Non-Material Changes in accordance with the definition in the OASIS TC Process (http://www.oasis-open.org/policies-guidelines/tc-process#dNonmaterialChange). [3] http://www.oasis-open.org/committees/process-2010-07-28.php#dSpecialMajority