Description
At the June 4th, 2013 meeting of the Infrastructure Framework Subcommittee, the members discussed the following topic:
1. TOPIC Should we advance the current DE 2.0 draft for a 15-day public review? (Answer: Yes. The following motion was passed: “I move that that we approve and recommend to the EM TC for advancement for a 15-day public review the DE 2.0 zip https://www.oasis-open.org/apps/org/workgroup/emergency-if/download.php/49304/edxl-de-v2.0-csprd03_withExtensions2.zip which supports community extensions.”)
References:
(1) Latest DE 2.0 zip: https://www.oasis-open.org/apps/org/workgroup/emergency-if/download.php/49304/edxl-de-v2.0-csprd03_withExtensions2.zip
(2) Latest DE 2.0 Basics White Paper (also included in the zip above): https://www.oasis-open.org/apps/org/workgroup/emergency-if/download.php/49303/DE_2.0_Basics_Draft_ver_11b.doc