Document:
02525: Approve PLCS v1.0 as a Committee Specification?

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Chet Ensign on 2013-10-16 12:09 am UTC

Publication Type

None at this time.

Group / Folder

OASIS Product Life Cycle Support (PLCS) TC / System Ballot Results

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

955

Download Agreement

None at this time.

Description

This ballot requires a Special Majority Vote [3]. The TC roster currently lists 9 voting members. In order to pass, at least 6 members have to vote Yes and no more than 2 members may vote No. [1] URI for the specification https://www.oasis-open.org/committees/document.php?document_id=50509 [2] The Working Draft for this Committee Specification contains changes made since its last public review. The changes made are documented in https://www.oasis-open.org/committees/download.php/50947 . The TC judges these changes to be Non-Material Changes in accordance with the definition in the OASIS TC Process (http://www.oasis-open.org/policies-guidelines/tc-process#dNonmaterialChange). [3] http://www.oasis-open.org/committees/process-2010-07-28.php#dSpecialMajority