Description
Notes to WD02 EI-CTS Schema
1) Migrated EMIX-Item to Resource/Product/Instrument compatible structures. (Simple-EMIX)
2) ProductBase is stil exensible, so it could handle other Resources with an extension schema
2) Payloads need to be reviewed for correctness
3) Have not collpsed Warrants into Simple-Emix yet. Warrants would permit trading of, say, renewable power within a CTS Market
4) We should consider doing away with siScale, leaving only a base10 exponent in its place