ebXML CPPA Technical Committee Teleconference
September 27, 2002
Attendance
Marty Sachs
Pete Wenzel
Dale Moberg
Ed Mooney
Peter Ogden
Himagiri Mukkamala
Tony Fletcher
Minutes
The agenda for the meeting is at: http://lists.oasis-open.org/archives/ebxml-cppa/200209/msg00022.html
Dale announced location of the new files with editorial corrections:
http://www.oasis-open.org/committees/ebxml-cppa/documents/ebcpp-2.0.pdf (which equals http://www.oasis-open.org/committees/ebxml-cppa/documents/ebcpp-2.0c.pdf)
http://www.oasis-open.org/committees/ebxml-cppa/documents/ebcpp-2.0c.doc
http://www.oasis-open.org/committees/ebxml-cppa/schema/cpp-cpa-2_0b.xsd
http://www.oasis-open.org/committees/ebxml-cppa/schema/cpp-example-companyA-2_0b.xml
http://www.oasis-open.org/committees/ebxml-cppa/schema/cpp-example-companyB-2_0b.xml
http://www.oasis-open.org/committees/ebxml-cppa/schema/cpa-example-2_0b.xml
The BPSS instance for 3A4 and the BPSS schema used were left unchanged.
SubTeam Reports
Marty reported on the Negotiation subteam by saying that Hima put out final BPSS instance document, Kartha will produce NDD schema and instance shortly, and that Jean was presumed to be working on the message schema and text.
Tony reported on the BTP Transaction subteam that during October we would see a draft appear.
The team approved the editorial changes. Dale urged everyone to check the links and inform him if any problems were found with them.
Implementation architecture draft discussion.
Tony Fletcher provided an introduction to his draft on an implementation architecture for ebXML. Marty noted that an audience for this material would be the developer community and that it would be most useful. Hima endorsed this viewpoint and added that it might be useful to let IIC review and comment on some of the material. Dale asked about the BPSS 2 and BPSS 3 nodes in the included chart, and Tony noted that an updated draft was to be appear on the CPPA list. Dale asked whether the BPEL4WS specification might cover some of the Business Process Execution component's functionality and urged consideration of this material before pushing BPSS in the execution language direction. Tony had to leave for another call, and everyone was encouraged to continue discussion on the list. Meeting adjourned.
|