OASIS Mailing List Archives
View the OASIS mailing list archive below
or browse/search using
MarkMail
.
This list only
All OASIS lists
Help:
OASIS Mailing Lists Help
|
MarkMail Help
ws-calendar
280 messages in this archive
(listed by date, most recent first)
|
Thread Index
|
List Home
[OASIS Issue Tracker] Commented: (WSCALENDAR-342) Is there astandard vlue for durations of Month and Year?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 30 Apr 2011 17:08:58 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-342) Is there a standardvlue for durations of Month and Year?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 30 Apr 2011 07:22:55 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-238) Line 147 - [weblinking] is undefined
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 16:42:55 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-228) Case of gluon typewrong
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 16:35:06 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-228) Case of gluontype wrong
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 16:34:56 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-260) Line 718, 1646 -are the items in the tables "parameters", "aspects" or "elements" - makeconsistent throughout document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 16:12:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-268) Line 271 -"Practitioners should consult..." refers to practitioners of what exactly?WS-Calendar? "Which Time? UTS vs. Local Time"? - clarify "practitioners"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 16:01:04 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-268) Line 271 -"Practitioners should consult..." refers to practitioners of what exactly?WS-Calendar? "Which Time? UTS vs. Local Time"? - clarify "practitioners"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 16:00:54 -0000
Re: [ws-calendar] Setting up GoToMeeting for today's Comment Reviews
From
wtcox@coxsoftwarearchitects.com on 29 Apr 2011 15:57:53 -0000
Setting up GoToMeeting for today's Comment Reviews
From
"Toby Considine" <Toby.Considine@gmail.com> on 29 Apr 2011 15:52:13 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-239) Line 180 - [XCAL]is not a reference in the document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:27:14 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-258) Line 1020 - does"availability" in the rules for Schedules and Availability mean"Availability" as defined in the document?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:27:05 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-258) Line 1020 - does"availability" in the rules for Schedules and Availability mean"Availability" as defined in the document?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:26:56 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-235) Line 74 - RFC 2616are a "draft standard". This is the state before "internet standard".
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:23:41 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-341) Collector forReference Checks
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:23:32 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-236) Line 71, 76, 78,80, 82, 84, 86 - RFC 2447, 3339, 4791, 4918, 5545, 5546, 5988 are a"proposed standard"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:23:24 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-232) Line 59 - Thecurrent revision is 03(http://tools.ietf.org/html/draft-cal-resource-schema-03).
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:23:15 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-250) Line 2639 -footnote states "This needs detailed discussion...". How can one beexpected to conform to a rule that needs (further) discussion? - tightenthe rule or delete
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:23:06 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-317) Line 837 - delete"[reference]" and insert the appropriate reference
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:22:57 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-341) Collector forReference Checks
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:20:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-251) Line 2688 - missingtext: "Still to come" probably not complete enough for conformance
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:19:15 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-253) Line 369-370 - Thestatement about "unanchored interval" both repeats the statement about"unscheduled interval" in 362-363 and appears to disagree with thedefinitions in 196 Table 1-6.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:19:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-256) Line 887 - Rrulestates that an interval can be bound by dtStart and dtEnd or by dtStart andDuration. However, Table 3-6 and 3-7 explicitly state that the pairdtStart/dtEnd is not allowed
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:18:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-259) Line 1022 -"Partitions are Sequences composed of consecutive Intervals" appears to bein conflict with line 180 "A Partition is a set of consecutive Intervals."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:17:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-272) Line 392-394 - itis unclear which elements are used from RFC 5988 from the list of elementsin Section 6.2.2 of that RFC - explicitly clarify elements
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:16:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-273) Line 395 -"Example" of "finishToFinish" does not appear to align with the"Definition".
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:15:14 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-274) Line 452 - "The twoexpressions of a Temporal Relationship above are equivalent" appears afterTHREE examples of temporal relationships. To which two is this statementreferring?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:15:05 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-281) Line 858 - it isunclear why there is a restriction on using only dtStart and duration, anddtEnd and duration, but NOT dtStart and dtEnd.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:14:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-340) Collector forConformance and Data Intetgrity
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:12:58 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-276) Line 453-465 - itappears that this language would be better served if the heading 3.1.4appeared before the text that starts on line 453.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:07:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-280) Line 718 - Changefirst column heading to "Parameter"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 15:06:53 -0000
Today's conf call
From
Benoît Lepeuple <b.lepeuple@arcinfo.com> on 29 Apr 2011 14:59:26 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-282) Line 870 - thedefintion of "Bound" in Table 1-6 does not include Duration, as in "BoundDuration" employed in the sentence.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:45:20 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-308) PR02 What are youdefining? XCAL? WS-Calendar? Some combination?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:45:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-324) Line 1873-1874 - the use of the word "owner" may be interpreted to apply to certain data,then a term other than "owner" should be used to avoid the legalimplications associated with using the term "owner"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:45:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-339) Collector forEditorial - muddled defintions or writing
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:44:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-278) Line 706 - headingis unclear and more explicit reference to Tolerance would be appreciated
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:43:02 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-279) Line 718 - ChangeTable heading to "Tolerance Parameters"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:42:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-305) Simpler and moreconstrained information model in addition to the PR02 information model
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:41:23 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-316) Table 3-5 - insertthe phrase "It may be 0." at the end of the definitions of"startAfterTolerance", "endBeforeTolerance" and "endAfterTolerance"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:41:15 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-338) Collector - try alittle Tolerance
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:41:06 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-338) Collector - try alittle Tolerance
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:40:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-237) Line 86 - RFC 5598is the incorrect reference, see the differences athttp://tools.ietf.org/html/rfc5988 "Web Linking" andhttp://tools.ietf.org/html/rfc5598 "Internet Mail Architecture"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:37:06 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-236) Line 71, 76, 78,80, 82, 84, 86 - RFC 2447, 3339, 4791, 4918, 5545, 5546, 5988 are a"proposed standard"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:36:57 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-233) Line 62, 78 - thesetwo references (CalDAV, RFC4719) are identical
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:35:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-231) Text needed on theuse of xs:anyType in the schema
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:34:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-230) Need to defineTOLERANCE property
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:33:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-229) Remove any unusedtypes from the schema, probably replace with some form of annotation.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:32:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-227) define the"components" and "properties" elements at the top level
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:31:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-226) Schema is wrongaround duration.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:31:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-224) Ws-Calendar looksto be a terrific advance for the smart grid and providing ways for users touse only what they need without having to understand all of Ws-Calendar.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:30:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-337) Collector forSchema Profiling and Simplification
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:29:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-336) Collector forSchema Data issues
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:28:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-225) The availabilityextension was not imported.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:27:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-222) Recurrence Rulesseem recursive, Unable to build VAvailability
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:27:01 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-221) Mispelled elementin Performance Characteristics
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:26:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-220) Schema Error inRecurType
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:25:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-217) Define performanceproperty
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:25:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-335) Collector forSchema Issues
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:24:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-306) Text and ReferenceIssues PR02
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:22:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-309) Page 9, Line 7 - insert a dash between "lead" and "times"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:20:57 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-310) Page 14, Table 1-4- grammatic errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:18:46 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-311) Page 15, Table 1-5- insert a period at the end on the definition for (i) "Bequeath" and (ii)"Inherit"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:18:37 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-312) Page 16, Table 1-6- insert a period at the end of the definition for "Constrained"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:18:28 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-313) Line 371 - insert acolon after "Interval"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:18:19 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-314) Line 454 - insert aperiod at the end of the sentence
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:18:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-315) Line 528 - deletethe phrase "one hour," and replace "three" with "3"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:18:02 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-318) Table 3-6 - deletethe periods after "DateTime" and after the word "Interval" in the Use for"dtEnd"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:17:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-319) Table 3-6 - replacethe comma at the end of the Discussion for "duration" with a period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:16:18 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-320) Table 3-6 - deletethe extra period after "3.2." in the Discussion for "WsCalendar Attach"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:16:09 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-321) Line 862 - deletethe word "and" after the phrase "based on"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:16:00 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-322) Table 3-7 -punctuation errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:15:52 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-323) Table 3-8 -Punctuation errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:15:43 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-325) Line 2622 - deletethe period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:15:34 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-326) Line 2625 - deletethe period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:15:25 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-327) Line 2635 - inserta period at the end of the sentence
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:15:16 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-328) Line 2674 - insertthe word "have" between "may" and "Intervals"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:15:07 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-329) Line 2675 - inserta space between "are" and "not"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:14:58 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-330) Line 2677 & 2678 - insert periods at the end of the sentences
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:13:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-331) Line 2694 - insertan "L" at the end of "SHAL"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:12:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-332) Line 2821 - replacethe word "Whilst" with the word "While"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:10:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-333) Line 2936 - replace"prodUTCion" with "production"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:09:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-334) Second Collectorfor Purely Mechanical Edits
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 14:08:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-333) Line 2936 - replace"prodUTCion" with "production"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:55:00 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-332) Line 2821 - replacethe word "Whilst" with the word "While"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:53:26 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-331) Line 2694 - insertan "L" at the end of "SHAL"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:53:17 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-330) Line 2677 & 2678 - insert periods at the end of the sentences
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:53:07 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-329) Line 2675 - inserta space between "are" and "not"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:52:58 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-328) Line 2674 - insertthe word "have" between "may" and "Intervals"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:51:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-327) Line 2635 - inserta period at the end of the sentence
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:50:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-326) Line 2625 - deletethe period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:49:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-325) Line 2622 - deletethe period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:48:55 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-324) Line 1873-1874 - the use of the word "owner" may be interpreted to apply to certain data,then a term other than "owner" should be used to avoid the legalimplications associated with using the term "owner"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:46:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-323) Table 3-8 -Punctuation errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:45:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-322) Table 3-7 -punctuation errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:44:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-321) Line 862 - deletethe word "and" after the phrase "based on"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:43:35 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-320) Table 3-6 - deletethe extra period after "3.2." in the Discussion for "WsCalendar Attach"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:43:21 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-319) Table 3-6 - replacethe comma at the end of the Discussion for "duration" with a period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:43:08 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-318) Table 3-6 - deletethe periods after "DateTime" and after the word "Interval" in the Use for"dtEnd"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:42:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-317) Line 837 - delete"[reference]" and insert the appropriate reference
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:41:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-316) Table 3-5 - insertthe phrase "It may be 0." at the end of the definitions of"startAfterTolerance", "endBeforeTolerance" and "endAfterTolerance"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:40:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-315) Line 528 - deletethe phrase "one hour," and replace "three" with "3"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:39:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-314) Line 454 - insert aperiod at the end of the sentence
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:38:56 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-313) Line 371 - insert acolon after "Interval"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:37:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-312) Page 16, Table 1-6- insert a period at the end of the definition for "Constrained"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:36:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-311) Page 15, Table 1-5- insert a period at the end on the definition for (i) "Bequeath" and (ii)"Inherit"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:34:57 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-310) Page 14, Table 1-4- grammatic errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:33:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-310) Page 14, Table 1-4- grammatic errors
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:32:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-309) Page 9, Line 7 - insert a dash between "lead" and "times"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 04:04:56 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-306) Text and ReferenceIssues PR02
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 02:44:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-308) PR02 What are youdefining? XCAL? WS-Calendar? Some combination?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 02:41:15 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-306) Text and ReferenceIssues PR02
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 02:41:07 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-307) Technical issues inSection 3 tables
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 02:40:56 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-306) Text and ReferenceIssues PR02
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 01:36:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-305) Simpler and moreconstrained information model in addition to the PR02 information model
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 29 Apr 2011 01:24:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-304) Collector forMechanically Editorial Issues
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:43:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-271) Line 387 - Thetitle of Section 3.1 is "Intervals, Temporal Relations, and Sequences" with"Intervals" occurring as Section 3.1.2 and "Sequences-Combining Intervals"occurring as Section 3.1.4. "Temporal Relations" is not explicitly Section3.1.3.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:42:16 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-267) Line 229-236 - Thisitalicized text appears to be a quote from a reference.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:42:06 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-234) Line 71 - RFC2447(from 11/1998, not 12/2009 as cited) is a "proposed standard" thatfurthermore has been obseleted by RFC 6047(http://www.rfc-editor.org/info/rfc2447)
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:41:57 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-240) Line 227 - "OASISReference Model for Service Oriented Architecture" is footnoted with apointer to section 1.2 rather than having an explicit [REFERENCE] likeother normative references.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:40:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-241) Line 259 - thecorrect term is "Daylight Saving Time" without the "s" on "Saving"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:39:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-242) Line 290 - "InSections n-n," does not appear to refer to a particulare section in thedocument (n-n does not exist).
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:38:04 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-243) Line 317, 332 -[ISO8601] is missing in section 1.2
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:37:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-244) Line 368 -[RFC5998] is incorrect
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:37:42 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-245) Line 389 - "WebLink [RFC5998]" is incorrect.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:37:32 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-246) Line 390 - parent,child and sibling are not defined in the cited Web Linking RFC but ratherin RFC 5545
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:37:23 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-247) Line 392 -[RFC5998] is incorrect - SHOULD BE [RFC5988]
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:37:10 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-248) Line 457 -"Components" as a keyword (used with capitalization) is undefined in thedocument - either define or change to "components"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:36:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-249) Line 858 -[RFC5998] is incorrect - SHOULD BE [RFC5545]
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:34:58 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-254) Line 822, 834 - isit "Designated Interval" or "designated Interval"? - employ correct termand make consistent throughout document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:31:17 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-257) Line 1020 - is it"Designated Interval" or "designated Interval"? - employ correct term andmake consistent throughout document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:31:05 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-261) Line 1646 - tableheading uses "aspects", column heading uses "element" - make consistent
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:30:55 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-262) Line 2690-2697 -this section is listed as item #3 in the bulleted list in 5.2 (line 2623)yet appears after the #4 and #5 bulleted items - make this section 5.2.3
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:27:25 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-264) Line 2662 - thisitem appears to align with item #5 in the bulleted list in 5.2 (line 2625)- make this section 5.2.5 and rename to "Semantic Conformance inWS-Calendar"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:27:10 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-263) Line 2657-2661 -this text appears to align with item #4 in the bulleted list in 5.2 (line2624) yet has no heading - add heading for this set of language: 5.2.4Covarying Attributes
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:26:59 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-265) Line 2673 - thisitem appears to be part of 5.2.3 - make this section 5.2.3.3 rather than5.2.4 and rename to "Bound Intervals and Sequences in WS-Calendar"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:25:12 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-266) Line 209 - "Thiswork provides the vocabulary..." is vague. To which work is it referring?Both preceding references? - clarify reference
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:25:02 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-268) Line 271 -"Practitioners should consult..." refers to practitioners of what exactly?WS-Calendar? "Which Time? UTS vs. Local Time"? - clarify "practitioners"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:24:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-269) Line 277 - "Whilethis specification the use of core semantic elements from iCalendar," isunclear as written.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:23:24 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-270) Line 385-386 - Thisis the first occurrence of using "note" text after an example. The notetext is actually useful to parse the example and would be better servedbefore the example.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:23:15 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-275) Line 461 - Thetitle of Section 3.1 is "Intervals, Temporal Relations, and Sequences" with"Intervals" occurring as Section 3.1.2 and "Sequences-Combining Intervals"occurring as Section 3.1.4.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:23:05 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-277) Line 531-532, 606 -line 606 appears superfluous with lines 531-532.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:22:56 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-283) Line 1646 - The"Note" for "timestamp" states "May include two objects as defined above."What two objects? Where above? The "Definition" is "WS-Calendar:time".
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:21:04 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-284) Line 1646 - the"Note" for "accuracy" uses the abbreviation "resp." without defining itanywhere in the document.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:20:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-285) Line 186 - citationin Table 1-4 for RFC5545 does not follow the OASIS convention - change to[RFC5545]
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:13:22 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-286) Line 198 - footnote6 wording - change to "...are as defined in [SOA-RM]."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:13:13 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-287) Line 263, 266 - useof personal pronoun "you" - reword sentences to eliminate personal pronounuse.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:13:04 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-288) Line 332 -redundant reference - delete sentence and put "[ISO8601]" in line 317 as areplacement for "ISO 8601"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:12:54 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-289) Line 368, 858 -inconsistent italicization of "Mandatory" and "Optional" in these and othertables where the terms are employed
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:11:03 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-290) Line 371 - missingperiod at end of sentence
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:10:53 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-291) Line 847 - "...areused to referencing and bind the..." - change "referencing" to "reference"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:10:43 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-292) Line 881 - twoperiods following "...unavailable.."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:10:33 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-293) Line 881 - a comma,not a period, following "...but not both," - change to period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:10:24 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-294) Line 1323 -"start-times" - remove hyphen, use space
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:10:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-295) Line 1324 - "it's"to "its" (remove apostrophe)
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:10:01 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-296) Line 1640 - strike"in smart grids"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:09:52 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-297) Line 1642-1644 -"It is not...that it caused."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:08:11 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-298) Line 1644 -"time-stamp" - remove hyphen, use space
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:07:57 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-299) Line 1646 -"accuracy" has an unmatched opening parenthesis mark. - add closingparethesis
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:07:47 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-300) Line 1655 -"time-stamp" - remove hyphen, use space
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:07:38 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-301) Line 1662-1663 -change "...in such a way." to "...in this manner."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:07:28 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-304) Collector forEditorial Issues
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:07:15 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-302) Line 2618 - delete"Semantic" from section header
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:07:06 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-303) Page 73 - removespurious footnote
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:06:56 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-304) Collector forEditorial Issues
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 28 Apr 2011 21:04:55 -0000
Registration discount offered to members planning to attend ConnectivityWeek 2011
From
"Jane Harnad" <jane.harnad@oasis-open.org> on 27 Apr 2011 22:52:28 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-303) Page 73 - removespurious footnote
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:38:01 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-302) Line 2618 - delete"Semantic" from section header
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:37:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-301) Line 1662-1663 -change "...in such a way." to "...in this manner."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:36:30 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-300) Line 1655 -"time-stamp" - remove hyphen, use space
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:36:21 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-299) Line 1646 -"accuracy" has an unmatched opening parenthesis mark. - add closingparethesis
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:36:12 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-298) Line 1644 -"time-stamp" - remove hyphen, use space
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:36:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-297) Line 1642-1644 -"It is not...that it caused."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:35:55 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-296) Line 1640 - strike"in smart grids"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:34:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-295) Line 1324 - "it's"to "its" (remove apostrophe)
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:34:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-294) Line 1323 -"start-times" - remove hyphen, use space
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:33:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-293) Line 881 - a comma,not a period, following "...but not both," - change to period
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:32:10 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-292) Line 881 - twoperiods following "...unavailable.."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:32:01 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-291) Line 847 - "...areused to referencing and bind the..." - change "referencing" to "reference"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:31:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-290) Line 371 - missingperiod at end of sentence
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:30:29 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-289) Line 368, 858 -inconsistent italicization of "Mandatory" and "Optional" in these and othertables where the terms are employed
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:30:20 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-288) Line 332 -redundant reference - delete sentence and put "[ISO8601]" in line 317 as areplacement for "ISO 8601"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:30:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-287) Line 263, 266 - useof personal pronoun "you" - reword sentences to eliminate personal pronounuse.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:30:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-286) Line 198 - footnote6 wording - change to "...are as defined in [SOA-RM]."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:29:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-285) Line 186 - citationin Table 1-4 for RFC5545 does not follow the OASIS convention - change to[RFC5545]
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:27:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-284) Line 1646 - the"Note" for "accuracy" uses the abbreviation "resp." without defining itanywhere in the document.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:26:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-283) Line 1646 - The"Note" for "timestamp" states "May include two objects as defined above."What two objects? Where above? The "Definition" is "WS-Calendar:time".
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:26:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-282) Line 870 - thedefintion of "Bound" in Table 1-6 does not include Duration, as in "BoundDuration" employed in the sentence.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:25:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-281) Line 858 - it isunclear why there is a restriction on using only dtStart and duration, anddtEnd and duration, but NOT dtStart and dtEnd.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:24:26 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-280) Line 718 - Changefirst column heading to "Parameter"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:24:17 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-279) Line 718 - ChangeTable heading to "Tolerance Parameters"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:24:08 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-278) Line 706 - headingis unclear and more explicit reference to Tolerance would be appreciated
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:23:58 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-277) Line 531-532, 606 -line 606 appears superfluous with lines 531-532.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:22:10 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-276) Line 453-465 - itappears that this language would be better served if the heading 3.1.4appeared before the text that starts on line 453.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:22:01 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-275) Line 461 - Thetitle of Section 3.1 is "Intervals, Temporal Relations, and Sequences" with"Intervals" occurring as Section 3.1.2 and "Sequences-Combining Intervals"occurring as Section 3.1.4.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:21:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-274) Line 452 - "The twoexpressions of a Temporal Relationship above are equivalent" appears afterTHREE examples of temporal relationships. To which two is this statementreferring?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:17:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-273) Line 395 -"Example" of "finishToFinish" does not appear to align with the"Definition".
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:16:10 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-272) Line 392-394 - itis unclear which elements are used from RFC 5988 from the list of elementsin Section 6.2.2 of that RFC - explicitly clarify elements
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:16:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-271) Line 387 - Thetitle of Section 3.1 is "Intervals, Temporal Relations, and Sequences" with"Intervals" occurring as Section 3.1.2 and "Sequences-Combining Intervals"occurring as Section 3.1.4. "Temporal Relations" is not explicitly Section3.1.3.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:15:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-270) Line 385-386 - Thisis the first occurrence of using "note" text after an example. The notetext is actually useful to parse the example and would be better servedbefore the example.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:14:12 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-269) Line 277 - "Whilethis specification the use of core semantic elements from iCalendar," isunclear as written.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:14:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-268) Line 271 -"Practitioners should consult..." refers to practitioners of what exactly?WS-Calendar? "Which Time? UTS vs. Local Time"? - clarify "practitioners"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 27 Apr 2011 00:13:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-267) Line 229-236 - Thisitalicized text appears to be a quote from a reference.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 22:13:56 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-266) Line 209 - "Thiswork provides the vocabulary..." is vague. To which work is it referring?Both preceding references? - clarify reference
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 22:11:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-265) Line 2673 - thisitem appears to be part of 5.2.3 - make this section 5.2.3.3 rather than5.2.4 and rename to "Bound Intervals and Sequences in WS-Calendar"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 22:02:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-263) Line 2657-2661 -this text appears to align with item #4 in the bulleted list in 5.2 (line2624) yet has no heading - add heading for this set of language: 5.2.4Covarying Attributes
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 22:01:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-264) Line 2662 - thisitem appears to align with item #5 in the bulleted list in 5.2 (line 2625)- make this section 5.2.5 and rename to "Semantic Conformance inWS-Calendar"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 22:00:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-262) Line 2690-2697 -this section is listed as item #3 in the bulleted list in 5.2 (line 2623)yet appears after the #4 and #5 bulleted items - make this section 5.2.3
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:54:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-261) Line 1646 - tableheading uses "aspects", column heading uses "element" - make consistent
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:53:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-260) Line 718, 1646 -are the items in the tables "parameters", "aspects" or "elements" - makeconsistent throughout document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:52:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-259) Line 1022 -"Partitions are Sequences composed of consecutive Intervals" appears to bein conflict with line 180 "A Partition is a set of consecutive Intervals."
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:52:01 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-258) Line 1020 - does"availability" in the rules for Schedules and Availability mean"Availability" as defined in the document?
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:51:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-257) Line 1020 - is it"Designated Interval" or "designated Interval"? - employ correct term andmake consistent throughout document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:41:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-256) Line 887 - Rrulestates that an interval can be bound by dtStart and dtEnd or by dtStart andDuration. However, Table 3-6 and 3-7 explicitly state that the pairdtStart/dtEnd is not allowed
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:40:05 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-255) Line 881, 887, 895- the granularity discussion in Table 3-7 and 3-8 is inconsistent with thetext in 895 with respec to "9:99" or "9:00"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:39:56 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-254) Line 822, 834 - isit "Designated Interval" or "designated Interval"? - employ correct termand make consistent throughout document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:35:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-253) Line 369-370 - Thestatement about "unanchored interval" both repeats the statement about"unscheduled interval" in 362-363 and appears to disagree with thedefinitions in 196 Table 1-6.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:34:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-252) Line 175-177 - thepractice of providing normative definitions in section 1.8, but perhapsextending/superseding/modifying later in the document as is statedpractice, seems ill advised.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:33:54 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-251) Line 2688 - missingtext: "Still to come" probably not complete enough for conformance
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:32:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-250) Line 2639 -footnote states "This needs detailed discussion...". How can one beexpected to conform to a rule that needs (further) discussion? - tightenthe rule or delete
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:32:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-249) Line 858 -[RFC5998] is incorrect - SHOULD BE [RFC5545]
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:31:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-248) Line 457 -"Components" as a keyword (used with capitalization) is undefined in thedocument - either define or change to "components"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:30:19 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-247) Line 392 -[RFC5998] is incorrect - SHOULD BE [RFC5988]
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:30:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-246) Line 390 - parent,child and sibling are not defined in the cited Web Linking RFC but ratherin RFC 5545
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:30:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-245) Line 389 - "WebLink [RFC5998]" is incorrect.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:29:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-244) Line 368 -[RFC5998] is incorrect
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:27:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-243) Line 317, 332 -[ISO8601] is missing in section 1.2
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:26:11 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-242) Line 290 - "InSections n-n," does not appear to refer to a particulare section in thedocument (n-n does not exist).
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:26:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-241) Line 259 - thecorrect term is "Daylight Saving Time" without the "s" on "Saving"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:25:52 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-240) Line 227 - "OASISReference Model for Service Oriented Architecture" is footnoted with apointer to section 1.2 rather than having an explicit [REFERENCE] likeother normative references.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:24:18 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-239) Line 180 - [XCAL]is not a reference in the document
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:24:09 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-238) Line 147 - [weblinking] is undefined
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:23:57 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-237) Line 86 - RFC 5598is the incorrect reference, see the differences athttp://tools.ietf.org/html/rfc5988 "Web Linking" andhttp://tools.ietf.org/html/rfc5598 "Internet Mail Architecture"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:20:02 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-236) Line 71, 76, 78,80, 82, 84, 86 - RFC 2447, 3339, 4791, 4918, 5545, 5546, 5988 are a"proposed standard"
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:19:52 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-235) Line 74 - RFC 2616are a "draft standard". This is the state before "internet standard".
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:18:14 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-234) Line 71 - RFC2447(from 11/1998, not 12/2009 as cited) is a "proposed standard" thatfurthermore has been obseleted by RFC 6047(http://www.rfc-editor.org/info/rfc2447)
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:18:05 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-233) Line 62, 78 - thesetwo references (CalDAV, RFC4719) are identical
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:17:56 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-232) Line 59 - Thecurrent revision is 03(http://tools.ietf.org/html/draft-cal-resource-schema-03).
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 21:15:54 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-228) Case of gluontype wrong
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 20:59:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-231) Text needed on theuse of xs:anyType in the schema
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:48:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-230) Need to defineTOLERANCE property
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:47:53 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-229) Remove any unusedtypes from the schema, probably replace with some form of annotation.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:45:56 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-228) Case of gluon typewrong
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:44:07 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-228) Case of gluon typewrong
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:43:58 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-227) define the"components" and "properties" elements at the top level
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:41:59 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-226) Schema is wrongaround duration.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:40:03 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-225) The availabilityextension was not imported.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 26 Apr 2011 17:39:54 -0000
RE: [ws-calendar] Underbrush....
From
Benoît Lepeuple <b.lepeuple@arcinfo.com> on 26 Apr 2011 07:24:36 -0000
Transactional Validation and Restricted Profiles
From
"Toby Considine" <Toby.Considine@gmail.com> on 25 Apr 2011 23:04:14 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-224) Ws-Calendar looksto be a terrific advance for the smart grid and providing ways for users touse only what they need without having to understand all of Ws-Calendar.
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 22:06:02 -0000
Re: [ws-calendar] Underbrush....
From
wtcox@coxsoftwarearchitects.com on 25 Apr 2011 14:26:34 -0000
What are *your* issues
From
"Toby Considine" <Toby.Considine@gmail.com> on 25 Apr 2011 14:01:35 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-223) All uses ofgranularity are not clear
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 13:59:59 -0000
Underbrush....
From
"Toby Considine" <Toby.Considine@gmail.com> on 25 Apr 2011 13:56:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-223) All uses ofgranularity are not clear
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 13:53:56 -0000
[OASIS Issue Tracker] Updated: (WSCALENDAR-217) Define performanceproperty
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 01:45:53 -0000
[OASIS Issue Tracker] Commented: (WSCALENDAR-217) Define performaceproperty
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 01:44:04 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-222) Recurrence Rulesseem recursive, Unable to build VAvailability
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 01:43:55 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-221) Mispelled elementin Performance Characteristics
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 00:57:58 -0000
[OASIS Issue Tracker] Created: (WSCALENDAR-220) Schema Error inRecurType
From
OASIS Issues Tracker <workgroup_mailer@lists.oasis-open.org> on 25 Apr 2011 00:53:53 -0000
Notes on Icalendar Schemas and transactional restrictions
From
"Toby Considine" <Toby.Considine@gmail.com> on 22 Apr 2011 20:02:19 -0000
Straw-man Restriction Schema on WS-Calendar
From
"Toby Considine" <Toby.Considine@gmail.com> on 22 Apr 2011 16:52:04 -0000
Groups - WS-Cal_PIM_20110419.EAP.zip uploaded
From
wtcox@coxsoftwarearchitects.com on 22 Apr 2011 15:40:08 -0000
Groups - WS-Cal_PIM_20110419.jpg uploaded
From
wtcox@coxsoftwarearchitects.com on 22 Apr 2011 15:30:20 -0000
Today's meeting will take place
From
"Gershon Janssen" <gershon@qroot.com> on 22 Apr 2011 11:25:01 -0000
PROPOSED AGENDA - Web Services Calendar (WS-Calendar) TC - 22 April 2011
From
"Gershon Janssen" <gershon@qroot.com> on 22 Apr 2011 11:19:20 -0000
Public review ends Easter Sunday evening...
From
William Cox <wtcox@CoxSoftwareArchitects.com> on 22 Apr 2011 01:56:10 -0000
RE: [ws-calendar] Friday's meeting -- who will join?
From
"Bartell, Bruce" <bbartell@xtensible.net> on 21 Apr 2011 20:47:11 -0000
Re: [ws-calendar] Friday's meeting -- who will join?
From
Dave Thewlis <dave@dcta.com> on 21 Apr 2011 15:54:24 -0000
Re: [ws-calendar] Friday's meeting -- who will join?
From
Mike Douglass <douglm@rpi.edu> on 21 Apr 2011 15:46:39 -0000
RE: [ws-calendar] Friday's meeting -- who will join?
From
Benoît Lepeuple <b.lepeuple@arcinfo.com> on 21 Apr 2011 08:59:55 -0000
Friday's meeting -- who will join?
From
"Gershon Janssen" <gershon@qroot.com> on 18 Apr 2011 19:10:11 -0000
WS-Calendar derivations
From
Edward Koch <ed@akuacom.com> on 17 Apr 2011 20:22:20 -0000
15 April WS-Calendar meeting canceled
From
"Gershon Janssen" <gershon@qroot.com> on 14 Apr 2011 22:05:18 -0000
Groups - Regular WS-Calendar Meeting cancelled
From
gershon@qroot.com on 14 Apr 2011 22:03:43 -0000
Next meeting April 15
From
"Gershon Janssen" <gershon@qroot.com> on 8 Apr 2011 11:26:00 -0000
Groups - Regular WS-Calendar Meeting added
From
gershon@qroot.com on 8 Apr 2011 11:11:48 -0000
Groups - WS-Calendar Namespace Declarations and Maintenance Policy 20110318.rtf uploaded
From
wtcox@coxsoftwarearchitects.com on 3 Apr 2011 15:37:04 -0000
Groups - WS-Calendar Namespace Declarations and Maintenance Policy 20110310.rtf uploaded
From
wtcox@coxsoftwarearchitects.com on 3 Apr 2011 15:24:24 -0000
No meeting today. Next meeting will be April 15
From
"Gershon Janssen" <gershon@qroot.com> on 1 Apr 2011 15:00:24 -0000
Mail converted by
MHonArc
2.5.0b2