Document:
SC Operational Procedures V1.2 (Draft)

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Mike Kaiser on 2010-02-19 9:46 pm UTC

Publication Type

None at this time.

Group / Folder

OASIS Open CSA Member Section / Steering Committee Documents

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

175

Download Agreement

None at this time.

Description

This document reflects the changes discussed in the Steering Committee Meeting of February 18th, 2010. It is placed here to allow members to review to insure that the changes reflect the intent of the discussion. Changes should be sent to the OpenCSA mailing list. If no changes are received prior to March 1st, 2010, this document will become final and operational effective on that date.