Document:
EI-CD01-PublicReviewComments-Overview-R1 (Revision 1)

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Girish Ghatikar on 2011-01-06 4:50 am UTC

Publication Type

None at this time.

Group / Folder

OASIS Energy Interoperation TC / Work Items

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

226

Download Agreement

None at this time.

Description

With Minor Editorial Revisions: This is a high-level overview for public review period that closed on December 27, 2010.