Document:
DRAFT-12-20-11-Minutes-IF-Subcommittee.doc

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Jeff Waters on 2012-01-17 8:58 am UTC

Publication Type

None at this time.

Group / Folder

EM Infrastructure Framework SC / Resources

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

98

Download Agreement

None at this time.

Description

At the December 20th, 2011 meeting of the Infrastructure Framework Subcommittee, the members discussed the following topics:

1. TOPIC: Is the DE 2.0 draft out for public review? (Answer: Yes. Chet and staff receive our thanks for the great work in getting our public review processed so quickly and effectively. The key link is http://oasis-open.org/news/announcements/pr-45-day-public-review-for-emergency-data-exchange-language-edxl-distribution-el The review period started Friday, Dec 9, 2011 and ends on Jan 24, 2012 )

2. TOPIC: Do we need to do specific and additional reachout to support getting comments from the public on our Distribution Element 2.0? (Answer: Yes. No public comments have been received so far. Lew will reachout to OGC and coordinate with Camille and others on reachout to FEMA. Rex will reachout to NCOIC. Jeff will reachout to his organization as well as coordinate with Elysa on reachout to TSO/ISO 223. Additional reachout would be encouraged. It is a busy time of year for a public review, but the review period can be extended, if need be.)

3. TOPIC: Are there additional materials that might help with our reachout efforts? (Answer: Yes. In the past, we’ve developed a “Distribution Element Basics” document, a more technical but still simplified overview document, a cheatsheet defining schema changes from 1.0 to 2.0, and portions of a summary elevator-speech. Jeff will coordinate an off-line collection of these documents, update them, and upload for our use.)