Document:
EI and NIST PAP09 Issues
Draft (A preliminary unapproved sketch, outline, or version.)
Details
Submitted By Mr. Girish Ghatikar on 2010-03-24 2:12 am UTC
Publication Type
None at this time.
Group / Folder
OASIS Energy Interoperation TC / Work Items
Modified by
Not modified.
Copy
This document is not a copy.
Technical Contact
None at this time.
Download Agreement
None at this time.
Description
Result of Action Item #36: Describe how original TC charter and deliverable fit into the current plans wrt PAP9.
Needs discussion with EI TC!