Description
This document is the latest draft (008) of the Transactional Energy Markets Information Model (TeMIX) White Paper published on May 5, 2010.
This draft reflects editorial corrections and changes from the 007 draft plus some additional examples at the end of the paper related to full-requirement tariffs, block tariffs, baseline estimation with full-requirements tariffs, and event-based demand response.