Title Approve PMRM v1.0 WD07 as new CSD and submit for a 15-day Public Review?
Description
The PMRM TC approves the latest draft (WD07):
[1] https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48732/PMRM-v1.0-wd07.pdf
as a new draft committee specification, drafted in response to the second public review
(http://docs.oasis-open.org/pmrm/PMRM/v1.0/csprd02/PMRM-v1.0-csprd02.pdf).
As this draft includes material changes to the previous public review draft, the TC requests that this new Committee Specification Draft also be submitted for a further 15-day Public Review.
The TC also notes that:
- the .pdf version referenced above is considered authoritative;
- the principal change is the inclusion of a Conformance section as required by the OASIS TC Process;
- an editable (.docx) version of the WD07 draft is available at: https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48733/PMRM-v1.0-wd07.docx
- for information, a ‘tracked changes’ version of the document is available at: https://www.oasis-open.org/apps/org/workgroup/pmrm/download.php/48734/PMRM-v1.0-wd07-tracked.pdf
The TC instructs the chairs to proceed with the formal requests to TC Administration for creation of the new Committee Specification Draft and Committee Specification Public Review Draft.
Ballot Options Ballot has closed
[ ] Yes
[ ] No
[ ] Abstain
Opening Date Thu, Apr 4 2013 9:00 am EDT
Closing Date Fri, Apr 12 2013 9:00 am EDT
Ballot has closed.