Title Approve submitting Energy Interoperation Version 1.0 [1] OASIS Standard to IEC
Description
Do you approve submitting OASIS Energy Interoperation V1.0 to IEC (International Electrotechnical Commission) for International Standard and presenting this request to the OASIS President as required by the OASIS Liaison Policy [2] pursuant to Terms of Submission [3]? 

This starts the OASIS liaison process with respect to OASIS Energy Interoperation 1.0, an OASIS Standard. The Technical Committee has discussed and evolved draft terms of submission in consultation with OASIS staff and others, including General Counsel James Bryce Clark. 

The draft terms of submission reflect the Technical Committee's desire to engage with IEC in furthering this work. 

The TC understands that the format of the Terms of Submission may change editorially, including designation as draft or final, as the liaison process continues. 

This ballot requires a Special Majority Vote [4]. The TC roster currently lists 11 voting members. In order to pass, at least 8  members have to vote Yes and no more than 2  members may vote No. 

[1] URI for the specification 
http://docs.oasis-open.org/energyinterop/ei/v1.0/os/energyinterop-v1.0-os.html

[2] OASIS Liaison Policy 
https://www.oasis-open.org/policies-guidelines/liaison

[3] Terms of Submission
https://www.oasis-open.org/committees/document.php?document_id=54003&wg_abbrev=energyinterop

[4] http://www.oasis-open.org/committees/process-2010-07-28.php#dSpecialMajority
Ballot Options Ballot has closed
[ ] Yes
[ ] No
[ ] Abstain
Opening Date Tue, Sep 9 2014 12:00 am UTC
Closing Date Mon, Sep 15 2014 11:59 pm UTC
Ballot has closed.

Referenced Items