1. Does the TC wish to adopt the set of proposed corrections as Committee Specification Draft Errata?
2. Does the TC confirm that the proposed corrections do not constitute a Material Change?
Quote from OASIS Defined Terms:
“Material Change” is any change to the content of a Work Product that that would require a compliant application or implementation to be modified or rewritten in order to remain compliant or which adds new features or otherwise expands the scope of the work product.
3. Does the TC wish to submit the proposed corrections for a 15-day public review? |