Document:
Revised TOSCA TC Timeline 2012 Sept.pptx

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Mr. Paul Lipton on 2012-09-20 5:10 am UTC

Publication Type

None at this time.

Group / Folder

OASIS Topology and Orchestration Specification for Cloud Applications (TOSCA) TC / Working Documents

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

111

Download Agreement

None at this time.

Description

Based on the volume of issues and work affecting the spec, the estimated timeline done in March 2012 needs to be revised. This PPT walks through the suggested changes.