Document:
TOSCA-v2.0-wd01-rev05-operation-definition-refinement-assignment-draft.docx (Revision 1)

Draft (A preliminary unapproved sketch, outline, or version.)

Details

Submitted By Dr. Calin Curescu on 2019-08-26 9:18 pm UTC

Publication Type

None at this time.

Group / Folder

OASIS Topology and Orchestration Specification for Cloud Applications (TOSCA) TC / Working Documents

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

246

Download Agreement

None at this time.

Description

A draft of how we could specify the definition, refinement and assignment for operations, w.r.t. their parameter defintion/refinement/assignment and implementation definition/change.

LEFT TODO:
- type derivations rules
- schema refinement rules
- requirement refinement rules
- artifact refinement rules
- attribute assignments
- parameter assignments
- make the difference between outgoing parameter assignments and incoming parameter to attribute mapping
- capability assignment rules
- requirement assignment rules