OASIS Message Queuing Telemetry Transport (MQTT) TC Public Documents

Number of Documents Show last documents per workgroup
Document Descriptions
OASIS Message Queuing Telemetry Transport (MQTT) TC   (Showing 10 of 467)
Document Name # Size State Submitter Date Action
0
--
OASIS Standard
Paul Knight
2019-03-07
OS: MQTT Version 5.0 OASIS Standard 07 March 2019 https://docs.oasis-open.org/mqtt/mqtt/v5.0/os/mqtt-v5.0-os.docx https://docs.oasis-open.org/mqtt/mqtt/v5.0/os/mqtt-v5.0-os.html https://docs.oasis-open.org/mqtt/mqtt/v5.0/os/mqtt-v5.0-os.pdf
0
17K
Draft
Chet Ensign
2019-02-11
MQTT Version 5.0 COS01 [1] completed its 60 day public review and received comments [2]. The TC has made changes to the Candidate OASIS Standard to address these comments. In accordance with section 3.4.2, ‘Public Review of a Candidate OASIS Standard’ of the OASIS TC Process [3], the TC affirms that: (a) Working Draft of MQTT Version 5.0 (contained in https://www.oasis-open.org/committees/document.php?document_id=64530) contains changes from Candidate OASIS Standard 01; (b) The changes are documented in http://docs.oasis-open.org/mqtt/mqtt/v5.0/cos01/mqtt-v5.0-cos01-comment-resolution-log.txt; (c) The changes are Non-Material; and (d) The changes were made ONLY to address the comments received during the public review period. Passing this ballot will result in the publishing of Candidate OASIS Standard 02 and an OASIS membership call for consent to approve it as an OASIS Standard. This ballot requires a Special Majority Vote. The TC roster currently lists 13 voting members. In order to pass, at least 9 (2/3 x 13) members have to vote Yes and no more than 3 (1/4 x 13) members may vote No. [1] http://docs.oasis-open.org/mqtt/mqtt/v5.0/cos01/mqtt-v5.0-cos01.html [2] http://docs.oasis-open.org/mqtt/mqtt/v5.0/cos01/mqtt-v5.0-cos01-comment-resolution-log.txt [3] https://www.oasis-open.org/policies-guidelines/tc-process#OASISstandard
0
--
Committee Draft
Paul Knight
2019-02-11
COS02: MQTT Version 5.0 Candidate OASIS Standard 02 11 February 2019 https://docs.oasis-open.org/mqtt/mqtt/v5.0/cos02/mqtt-v5.0-cos02.docx https://docs.oasis-open.org/mqtt/mqtt/v5.0/cos02/mqtt-v5.0-cos02.html https://docs.oasis-open.org/mqtt/mqtt/v5.0/cos02/mqtt-v5.0-cos02.pdf
0
13K
Draft
Richard Coppen
2019-02-01
0
20K
Draft
Ian Craggs
2019-01-29
0
13K
Draft
Ken Borgendale
2019-01-25
This is the issue resolution document to be used if the TC decides to fix MQTT-535. This shows all three JIRAs to be Resolved-Fixed and Closed. The assumption is that at the 31 January 2019 TC meeting we will go forward with either cos01b or cos01c.
0
360K
Draft
Ken Borgendale
2019-01-25
This is a candidate document without change markings to be used if the TC decides to fix MQTT-535. The only change from mqtt-v5.0-cos01b.docx is the addition of one sentence in section 3.2.3.1 making the Property Length optional if the value is zero. The assumption is that at the 31 January 2019 TC meeting we will go forward with either cos01b or cos01c.
0
362K
Draft
Ken Borgendale
2019-01-25
This is a candidate document with change markings to be used if the TC decides to fix MQTT-535. The only change from mqtt-v5.0-cos01b-changes.docx is the addition of one sentence in section 3.2.3.1 making the Property Length optional if the value is zero. The assumption is that at the 31 January 2019 TC meeting we will go forward with either cos01b or cos01c.
0
13K
Draft
Ken Borgendale
2019-01-16
Proposal for request for consent document showing issue resolution. These are proposed resolutions and are not yet voted on by the TC.
0
1MB
Draft
Ken Borgendale
2019-01-16
Proposal for request for consent document in pdf format