Votes needed to progress toward Approved Errata

  1. Shall the TC approve the combination of these documents as Committee Specification Draft Errata?
    Errata
    SARIF Standard with Errata incorporated (w/change bars)
    SARIF Schema with Errata incorporated
  2. Does the TC agree that the Errata do not constitute a Material Change?
  3. Does the TC approve requesting that OASIS initiate a 15-day public review of the errata?